The European business unit radically redesigned several internal processes that led to substantial savings. In one key instance, a campaign-briefing process went from a cumbersome multi-week operation to an energizing 90-minute design-driven collaboration. This reduced time resulted in $250,000 in savings over the first three months, with those savings expected to repeat every quarter in perpetuity.